Tracc Civil completed civil and cable installation works for Western Power’s reinforcement project, installing approximately 6.7 kilometres of underground cable.





The project extended from Wanneroo Zone Substation through Meridian Park to Global Road, reinforcing the local electricity network. Tracc Civil coordinated drilling, trenching and cable installation around live infrastructure, local roads and neighbouring properties.
The scope included:
The alignment passed alongside live electricity, gas, water, sewer and telecommunications infrastructure. Service locating and staged construction were central to managing these interfaces, while directional drilling limited the extent of open excavation.
The works were completed without service strikes or final defects. The project reflects the coordination maintained by the civil, drilling and electrical teams when delivering underground power infrastructure within an established urban environment.
Tracc Civil’s work on the project was recognised with a finalist place in the 2026 CCF WA Earth Awards.