top of page

Great Northern Connect - Northlink

Location: Gnangarra

​

Project Start: 8 November 2016

​

Project Finish: 31 March 2019

​

Project Value: $15.3m

​

Client: GNC - JV Laing O'Rouke and BGC Brenton Talbot

​

​

Overview

Tracc Civil is providing the earthworks and roadworks for the construction of the road between Ellenbrook and Muchea.

​

Scope

  • Foundation preparation

  • Embankment construction

  • Sub-grade and structures earthworks

 

Safety

All safety expectations have been met.

During the construction period Tracc Civil have had 0 incidents or accidents to date.

​

Project Challenges

  • Dust suppression

​

We recognized that management of dust is important especially in the drier summer months. It can be unpleasant living in close proximity to a construction site, and we’ve worked hard to minimise the impacts of dust overflow on surrounding residents. Some of the methods used to minimize this included:

  • Hydromulch and Dustex

  • Consistent scheduling of Water carts and cannons to wet down access tracks and surrounding site

  • Efficient and effective dust monitoring to ensure construction dust is kept within the prescribed limits.

  • Working with prevailing winds whenever possible which minimized opportunities for dust to blow off and onto surrounding properties and businesses.

​

​

bottom of page