Great Northern Connect - Northlink
Location: Gnangarra
Project Start: 8 November 2016
Project Finish: 31 March 2019
Project Value: $15.3m
Client: GNC - JV Laing O'Rouke and BGC Brenton Talbot
Overview
Tracc Civil is providing the earthworks and roadworks for the construction of the road between Ellenbrook and Muchea.
Scope
-
Foundation preparation
-
Embankment construction
-
Sub-grade and structures earthworks
Safety
All safety expectations have been met.
During the construction period Tracc Civil have had 0 incidents or accidents to date.
Project Challenges
-
Dust suppression
We recognized that management of dust is important especially in the drier summer months. It can be unpleasant living in close proximity to a construction site, and we’ve worked hard to minimise the impacts of dust overflow on surrounding residents. Some of the methods used to minimize this included:
-
Hydromulch and Dustex
-
Consistent scheduling of Water carts and cannons to wet down access tracks and surrounding site
-
Efficient and effective dust monitoring to ensure construction dust is kept within the prescribed limits.
-
Working with prevailing winds whenever possible which minimized opportunities for dust to blow off and onto surrounding properties and businesses.