Location: South River WA
​
Project Start: 19 March 2018
Project Finish: 6 July 2018
Project Value: $1.9m
Client: City of Gosnells (Brad Harris, Porter Consulting Engineers)
​
Overview
Tracc Civil was contracted to transform Huntingdale’s Sutherlands Park into a new synthetic hockey ground, the first of its kind in Perth’s South-east.
Scope of work included the following:
-
Demolition works
-
Earthwork - Ground works to clear and level the site; install sub-soil drainage and deliver infill to raise flood-prone areas by up to 800mm
-
Retaining & rebound walls
-
Turf sprinkler system, water storage tank and water treatment system
-
Lighting and electrical controls
-
Stormwater drainage
-
Security fences and gates
-
Player and technical control shelters
-
Sewer pump station and associated facilities
-
Sewer rising main and sewer reticulation mains
-
Demolition of existing buildings
-
Road base of 6000m2 to very strict tolerances
​
Project Challenges
-
Strict time requirements as City of Gosnells staff is based onsite
-
Junior training needed to continue during construction
Managing These Challenges
-
Fencing was installed to prevent access to site locations under construction.
-
Effective communication between City of Gosnells staff, Western Power and third party entities to provide seamless construction that met the deadlines provided.
​